
Asset risk is never isolated. Whether it’s conductors, poles, or station equipment, each component operates within a complex, interconnected system.
Assets are often modelled as if in a vacuum, when, in reality, asset failures cascade across the grid, affecting reliability downstream. That’s why planning must account for system-wide dynamics like redundancy, reliability, and load growth.






















Project delivery.
Improved reliability to customers.
Average ROI realized within the first planning cycle.